Quam ut install frigus repono

Views: 3     Author: Editor Public Time: 2019-09-26 Origin: Situs

Frigus repono contenta
   frigus repono projects maxime includit: omnes de frigore repono apparatu et facilities commeatus, materiae procurationem, bibliothecam machina, in INDIGNATIO et extra et extra machina ratio, intra et extra machina potestate, intra et extra machina potestate, intra et extra machina potestate, intra et extra machina, et in acie, et extra machina, in acie, et extra et ratio debugging. Power supply required cold storage units that is not included in the present installation cable into the range, cold storage unit and the basic construction and civil engineering complex, we are responsible for the distribution parameters and provide the relevant drawings.
   Section II, the main construction methods and technical requirements
   First, install the total cold storage
   Labor organization, equipment approach, Mixed drawings and technical tests, material procurement support bracket entering production, storage body then stitching, perforated wall, drain line installation, support bracket mounting, welding to install the main line, the main line insulation,
   Manifold welding, pipe insulation, laying of control lines, the indoor unit is fixed blow dirt and interface, and an outdoor stationary hanger interface unit piping system, pressure testing, leak testing and drainage, vacuum system, the system charge fluoride, test machine debugging run, finishing the final system acceptance
   Second, the installation points and technical requirements:
1.Wall perforation and treatment:
   Since the system requirements and drainage lines required storage body and through the wall, should be approved open position and size of the holes, after the correct size marked hole opened in the play hole Wall, murum perforationes oportet signum civile ipsum Technicas comments non effectum in site post aedificationem structuram ut portare e terebro operationem. Pipeline per foraminis in muro, per malleo perforationem. Si perforatum murum malleo alienum in tergo de consensu domini consensu aliter perforatur. Magnitudinem foraminis transire per lineam (inter tellus) praevalere linea debet sita per murum ferro armamentis, Pipeles non potest esse in muro cannula, et non-combustable metallum in cannula vel inanis et non-combustable muro vel in Cannula et non-combustable Metal Cannula non esse, sed non esse saltem altius in cannula , et non-combustable metallum, ut non sit in manicis.
2.Umbraticis Unit Est installed:
   Gradus: Determinare locum UMBRILORUM unitas ducatur lineas Indexer reamer reaming Certa ciere → → Indoor → tibia tibia principiis (
3.fistularum
   1debet tibiarum arida tibia tibia tibia arida ) fistularum
   arida 2esse stricte pipe triplici → emissiones.
   Primo ante siccatio aqua in aeris tubo mounted prohibitus post tibula est ut sequitur purgare et vacuo exaruit. Cura debet attendendum quod Purgato fistula est mundus, purgatam cum NITROGENIUM etiam Welding est Welding, et tandem flante. Una est ut emendatos test weld qualis et flare nexum qualis, secundum quod ultima Leak test.
   ( 3) NITROGENIUM postea modum:
   NITROGENIUM Refrigerant pipe necesse esse cum solidatorium, Welding in Micro-pressura ( III ~ 5kg / cm² ) et NITROGENIUM tibiarum fistulas scandalis, interiorem fistulam ita generatae ne scala.
   ( 4) Refrigerant pipe Agricola:
   capping magna refrigerare pipe, ut ne humorem, lutum, pulvis et sicut in tubo, in refrigerare pipe per murum debet esse arcte facis Ferro, bonum nexum est ad tempus pone COLLUS FERRULe inuenisse.
   ( 5) Purgare Refrigerant pipe:
   Refrigerant pipe flante optimum modum ad remotionem de perditio ex interiore fistulam, specifica modum est NITROGENIUM ad pneumatic PORUM CYMBALON de velit unitas ad pneumatic PORUM, interface cum caeci plugs in omni in umbraticis bonum retention. In umbraticis interface sicut outfall, in insulating materia contra COLLUM, a pressura regulantes valvae 5kg / CM² inflendes in interiore tubo, quod velox release cum NITROGENIUM Gas et aquam, qui est cum NITROGENIUM et aquam, qui est in manu. Ita aliquot cyces usque ad fluxum aquae liberae lutum (facite omnem unitates unitates).
   Praeterea, in tibia et tibia ut peragatur seorsum.
   ( 6) Brazing in refrigerare pipe:
A. Refrigerant praeparatio ante Brazing Tube: Latin Brazing virga qualis, paratus Welding apparatu, ad aes interficiam superficiem lenis, sine burgum, etc. ad convexa defectus, in fube concedit planum, deviare diametri de fube I%.
b. Refrigerant pipe debet parare vel phosphorases aes electrode argentum electrode, solder temperatus 700-845 , brazing opus facile in proclivi vel horizaturae latera, ut vitare possibile superadditam, in iuncturam germinum portum esse tenentur.
c. Horizontalis tubulis (aes) spaced sustinet sequenti criteria:
   nominis φ20 sequenti φ25-40 φ50
   intervallum ( m ) 1.0 1.5 2.0
   note sit in naturali metallo et in fistulas in fistulas in aeris, ne generationi frigus pontes.
d. Welding personas debet habere necessaria, ut stipes.
E. The gas pipe during the welding operation of the valve, the cooling process must be carried out (with a wet cloth wrapped body), or cause leakage
   ( 7) Diameter of less than Φ19.05mm Brass all using field simmer, bending or cold bending special bending tools, should not be greater ellipticity 8% , Mounted side by side pipe bending radius should be the same distance, slope, slope should be consistent. Plus quam in φ19.05mm aere stamping cubito debet esse.
   ( 8) Fladed nexu:
   Refrigerant et in umbraticis unitas sunt connected usura aes flare nexu, ita operam ad qualis est expansion de campana os. Wherein the depth of the flared bell mouth is not less than the diameter, the flaring should welcome refrigerant flow direction, pipe cutting using a dicing blade, coated with a little refrigeration oil on the inner surface of the flared when flared and locknut, size and flaring nut torque in the following table:
   Nominal diameter copper tube flared tube diameter sizes torque ( kgf-cm )
1/4 Φ6.35 9 .1-9 .5140-180
3/8 φ9.52 XII .2-12 .8340-420
1/2 φ12.7 XV .6-16 .2340-420
5/8 φ15.7 XVIII .8-19 .4680-820
3/4 φ15.05 XXIII .1-23 .71000-1200
4, omnes oportet utor Refrigerant Pipe SLAB ad ferro.
5, Drain installation: the use of drains PVC or PPR Plastic tube:
   ( 1) The steps of: connecting pipe Laying heating wires Check the water leak Heat insulation
   ( 2) Before pipeline installation must be dirt and rust in the pipes cleaned, the pipe openings should be sealed protective measures taken during installation to a halt.
   ( 3) Drains effective distance as short as possible in the interior, the horizontal drain pipe should slope gradient is 1/100 to 1/50
   ( 4) Between the drain and the drain compartment tray dryer for a period of preferably flexible connections, tray and compartment dryer condensate drain should be higher than the drain interfaces, PVC Dedicated line PVC Glue connection. Aqua INCILE ratio Leak test potest esse aqua-repleti test, nullum leakage est gratum.
   ( 5) Post pipe installation ratio debet esse feroces ante connectens purgato ratio.
6Imperium linea operationes:
   Imperium lineae usura tincidunt filum posita per ligans refrigerare pipe, in umbraticis imperium pars per tubos tenebras, ut ne interpositis.
7, Vallum opus:
   Opus Electio basis habens Adiabatico consilio requisitis, posuit simul in Bushing Nulla constructione, Weld et relinquens ultimum weld processus. Et absoluta prohibitio de Valerius off phaenomenon in constructione periodum, esse certus ad usum Sleeve gremio cingulum accinctus renes.
8, Unitates installed foras et bibliotheca
   ( 1) unpacking foras, unitas apparatu, inspectionem apparatu satiata foramen inspectionem record sheet;
   ( 2) Tractantem et elevatio apparatu unitatis extra et bibliothecam;
   ( 3) Sedens in exterior gallery tectum basi unitatis (civilibus complexu), cum basis unitas vel per pedem bracket. Inter bibliotheca et bibliotheca apparatus extra machina, technical ordinationes et correlationem inter velit unitas aedificii ad facere.
9, Airtightness Test:
   ( 1) Sequential Operations: Refrigerant Piping completed NITROGENIUM pressura Tempus Imperium Reprehendo Pressure qualified
   ( 2) organization et division of Testing personas.
   ( 3) Quaestiones: A Refrigerant tubus ad esse pressurized cum arida NITROGENIUM, quod tardius pressurized test,
   primum scaena: 3.0 kg / cm² Pressurization 3minuta vel magis;
   Secundum Tempus: XV kg / CM Pressurization 3minuta vel magis;
   Tertium scaena: XXX kg / cm² horam 24utrum
   observatur pressura gutta, si non declines est qualified, sed pressura mutare temperatus mutatio, omnis mutatio 1Pressurization mutationes , non erit emendari. Reprehendo pro leaks potest affectus a sensu sensu auditus, soapy aqua Leak deprehendatur, pressura test post completionem NITROGENIUM ad NITROGENIUM missionem kg / CM ² ad III pressionem in elementum Leak Detector.
   ( 4) Per test debet perficitur emissiones test record (record saturamini textu patet, verus)
10et siccat in vacuo
   ( 1) NITROGENIUM pressura temptare ratio post transeuntes ad vacuo siccatio, vacuo systema post transitum ad vacuo siccatio, vacuo systema post transitum ad vacuo siccatio, vacuo systema post transeuntes ad vacuo siccatio, vacuo systema post transeuntes ad vacuo siccatio, vacuum systematis post transeuntes ad vacuo siccatio, vacuum systema post transitum ad vacuo siccatio, vacuo systema post transeuntes ad vacuo siccatio, vacuum siccatio ut occursum qualis est.
   ( 2) Et exaruit in vacuo eligere gyratorius sentinam (obsessio 4L / min ) ante usum reprehendo evacuat vacuo facultatem requiritur ad consequi -755mmhg ante procedens.
   ( 3) In sequentibus ordine:
   continued operatio in vacuo sentinam vacuo mensa 2hora vel (gradu vacuo debet esse -755mmmhg supra), ut pervenire . debet 1reprehendo ut permanere elit
   consequi -755mmhg post, vos can ponere in 1horis, vacuum MODULUS non oriri ad qualified, ut oriri indicat ad Lake Portus vel aqua, ut permanere dispensando.
   post vacuum transiens test, ratione secundum ad moles refrigerant implens et aperire valvae (nota debet evacuantur utrinque pipe et liquido fistula). In casibus
   speciali, specialis vacuo siccatio cellula plus nitrogen.
   ( 4) Quod supra test si recordum in pertinet forma.
11, Freon refrigerant implens:
   filling freon refrigerant impletionem perficitur ad normam cum requisitis technical notitia.
   Tertio, pelagus difficultas constructione et frigus repono solutions
   ut ad refrigerandum pipe est omnino mundare, liberabo impudicitiis, humorem libero.
   Solutio est: selectio sit stricte. φ19.05 aeris tubo usura totius fasciculo post, minimize weld. non praestat tutela NITROGENIUM WELDING. ④ in occursum de requisitis flante luto. ad consequi vacuum requisita. Freon refrigerare addidit ad systematis usus est in US Dupont, Gallia Alto aut domestica brands.
   Quartum, frigus repono project ipsum et tutela modi
   pelagus corporis contentus praesidium est bibliotheca et bibliothecam intra et extra unitas.
   Celicelio repono corpus installed in apparatus, sequitur remotionem ornamentum film. Extra et bibliothecam et Dismantling unitas cum in loco.
   Omnes lineae non connexa bibliotheca omnes usus signum Zhakou protegat fronte extra machina.


Contact Us

   Add
Tianjin Sinis

   telephono
LXXXVI - 18698104196 / == I ==

   E-mail
Apricus. == II ==
, sunny@fstcoldchain.com

   Cras  
export0001 / LXXXVI - == III ==

Contact Us

Contact persona: Sunny Solem

Phone: LXXXVI - == IV == / == V ==

Whatsapp / Facebook: LXXXVI - == VI ==

Weckat / Cras, LXXXVI - == VII ==

E-mail: Apricus. == VIII ==
              , sunny@fstcoldchain.com

Mail Subscription

Link

 APPAREO  LEGUS