+86-18698104196     |        sunny.first@foxmail.com
You are here: Home » News

Quick-freezing library

A list of these Quick-freezing library articles makes it easy for you to quickly access relevant information. We have prepared the following professional Quick-freezing library, hoping to help solve your questions and better understand the product information you care about.
  • 2019-12-26

    Freezing and refrigeration system debugging and precautions

    I. Precautions during operation of the refrigeration system: The expansion valve is one of the four major components of the refrigeration system. It is an important device for regulating and controlling the flow and pressure of the refrigerant into the evaporator. It is also the \"demarcation line\" on the high and low pressure side. Its adjustment is not only related to the normal operation of the entire refrigeration system, but also an important indicator of the operator's skill level. The adjustment of the expansion valve must be performed carefully and patiently. The adjustment of the pressure must take place through the evaporator and the temperature of the warehouse to produce boiling (evaporation), and then enter the compressor suction chamber through the pipeline to reflect on the pressure gauge, which requires a time process. Each time the expansion valve is adjusted, it usually takes 15-30 minutes to stabilize the adjustment pressure of the expansion valve on the suction pressure gauge. The suction pressure of the compressor is an important reference parameter for the adjustment pressure of the expansion valve. The expansion of the expansion valve is small, and the flow rate of the refrigerant is small, and the pressure is low. The expansion of the expansion valve is large, and the flow rate of the refrigerant is large, and the pressure is also low.

  • 2019-12-26

    Cold ton-horse-power-unit conversion-cooler matching knowledge

    Cold ton (RT): A unit of air-conditioning refrigeration. Cold ton is also known as frozen ton. Frozen ton refers to the energy required to freeze one ton of water into ice. (Note: 1 cold ton is the cooling capacity required to make 1 ton of 0 ° C water into 0 ° C ice in 24 hours.) 1 ton of 0 ° C water can be converted into 0 ° C ice in 24 hours , Frozen tons represent the refrigeration capacity of the freezer.
    Horsepower (HP): The number of horsepower (PH) in air-conditioning cooling capacity is calculated in kilocalories or watts (W). Generally speaking, 1PH = 2000 kilocalories, multiplied by 1.16 in international units.
    Calculate 2500W as the standard 1PH in daily life. 23 represents a small horse; the cooling area is 10-14 square meters. 26 stands for 1 horse; cooling area is 14-18 square meters. 32 represents a small 1.5 horse; the cooling area is 18-22 square meters. 35 represents plus 1.5 horses; refrigeration area is 22-25 square meters

  • 2019-11-27

    Precautions for the use and maintenance of quick freezing refrigerators

    Precautions for the use and maintenance of quick-freezing cold storage: 1. Prevent the freezing and thawing cycle, freezing and freezing of the building structure. 2. Protect the floor from frost and damage. 3. In the use of quick-freezing warehouses, the freezing and refrigerating capacity should be brought into full play in accordance with the design requirements, ensuring safe production and product quality, and maintaining the cold-storage building structure. The warehouse should set up a special team to manage, and the responsibility should be implemented by everyone, every warehouse door, every piece of equipment and tools.

  • 2019-11-27

    Installation precautions

    Attentions for the installation of quick-freezing cold storage: 1. The foundation of the quick-freezing cold storage is affected by low temperature, and the moisture in the soil is easily frozen. Due to the volume expansion of the soil after freezing, it will cause ground rupture and deformation of the entire building structure, which will seriously make the cold storage unusable. For this reason, in addition to an effective heat insulation layer, the floor of the quick freezing cold storage must be treated under the heat insulation layer to prevent the soil from freezing. 2. The installation of quick-freezing cold storage uses stainless steel plate, embossed aluminum plate, colored steel plate, and composite plastic steel plate as the panel, rigid polyurethane foam plastic as the insulation material, and the composite wall panel is made by advanced technology. Good performance, corrosion resistance, anti-aging and moth-proofing, non-toxic, non-mildew, it can show its superiority when used at lower temperature. The inner and outer panels of the board are made of colored steel (the base material is galvanized steel). The core of the board is foamed rigid polyurethane or pasted polystyrene foam board. Since all components except the ground are

  • Total 2 pages  Go to Page
  • Go

CONTACT US

  Add
Tianjin China

  Phone
+86-18698104196 / 13920469197

  E-mail
sunny.first@foxmail.com
sunny@fstcoldchain.com

  Skype 
export0001/ +86-18522730738

CONTACT US

Contact Person : SUNNY SUN

Phone : +86-18698104196 / 13920469197

Whatsapp/Facebook : +86-18698104196

Wechat/Skype : +86-18698104196

E-mail : sunny.first@foxmail.com
              sunny@fstcoldchain.com

Mail Subscription

QUICK LINK

 Support By Leadong